Cableways Speikboden
Cableways Speikboden
Alm-Express
Alm-Express
Operation Schedules
08:30 - 16:00
Mon
Tue
Wed
Thu
Fri
Sat
Sun
In the season 2007/08, the new gondola-lift "Alm-Express" was put into operation. The ultra-modern lift replaces an old chairlift and guarantees a very high level of safety, especially for families with children.
The new lift costs 5.7 million euros. With its 29 eight-seater cabins over a length of 700 meters it climbs 150 meters in altitude and transports 2,400 people in an hour.
The new lift costs 5.7 million euros. With its 29 eight-seater cabins over a length of 700 meters it climbs 150 meters in altitude and transports 2,400 people in an hour.
The gondola-lift Alm-Express guarantees a very high level of safety, especially for families with children.
Public parking at the valley station Speikboden
Cableways Speikboden